Friday, October 9, 2009

FIRST VIDEO TOUR

Major efforts are underway as we "MAKE A PLACE AT THE TABLE", but its very difficult to capture with regular photographs. Therefore today, I begin a new feature where I walk through the construction and let you watch as our new church begins to take shape. I will be posting 3 different videos in this first posting.

The first video was taken as I walked from the Parking through the mud (we had 3/4 inches of rain last night) to the cloister and the front entrance.




The second video begins just inside the front doors and walks from the Narthex into the Nave. The workers you will see are spraying sealer on the ceiling.




The third video was taken beginning at the rear of our church near the entrance to the Day Chapel. All the windows you see have the protective glass installed and our restored Stained Glass Windows will be installed near the end of construction.

4 comments:

  1. Tom you are doing a great job with this blog. I have been away for awile and can't believe the progress. Look forward to your posts. Thank you!

    ReplyDelete
  2. Thank you, Tom. It is really nice to get an inside view without having to put on a hard hat>
    Susan Weimer

    ReplyDelete
  3. Thank you, Tom for this walking tour. It is nice to see the inside without a hard hat.

    ReplyDelete
  4. good job Tom! walking, talking and videoing - quite impressive. seriously, thanks for giving us a super look at the progress.

    ReplyDelete