IT'S HARD TO SEE, BUT THE WORK CONTINUES

We had another another very productive week on site. If you’ve been by, the look of the church hasn’t changed much because most of their efforts were inside. The installation of the ceiling and protective plywood and tarpaper continued.

The framing continued on the inside and outside with the window openings along the top of the Nave clearly visible.

Preparation for pouring the concrete floor in the Day Chapel and back of the Nave was completed as seen in the photo above.


The concrete trucks arrived at 6:30 AM on Monday and the pouring of the floors previously mentioned began. It took all day to get the finished look on the floors. Now the framing can begin in these areas.